毛茅, 潘娟, 朱庆荣, 吴智泉. 基于B/S架构的清洁发展机制(CDM)项目管理系统研究与应用[J]. 现代电力, 2011, 28(1): 75-79.
引用本文: 毛茅, 潘娟, 朱庆荣, 吴智泉. 基于B/S架构的清洁发展机制(CDM)项目管理系统研究与应用[J]. 现代电力, 2011, 28(1): 75-79.
Mao Mao, Pan Juan, Zhu Qingrong, Wu Zhiquan. Research and Application of CDM Project Management System Based on B/S Architecture[J]. Modern Electric Power, 2011, 28(1): 75-79.
Citation: Mao Mao, Pan Juan, Zhu Qingrong, Wu Zhiquan. Research and Application of CDM Project Management System Based on B/S Architecture[J]. Modern Electric Power, 2011, 28(1): 75-79.

基于B/S架构的清洁发展机制(CDM)项目管理系统研究与应用

Research and Application of CDM Project Management System Based on B/S Architecture

  • 摘要: 我国温室气体减排潜力巨大, 清洁发展机制(Clean Development Mechanism, 简称CDM)项目与日俱增。分析了CDM项目开发的特点, 描述了建立CDM项目管理系统的思路和方法, 结合CDM项目开发的流程, 构建了CDM项目开发模型, 实现了项目管理、合同管理、资金管理、项目发电量分析及统计、知识库等功能, 同时该系统具有预警提醒、统计分析和知识分析等内容, 将数量庞大的CDM项目的开发进行优化管理, 加强风险管理, 提供科学的决策支持。根据上述管理目标研制开发的基于B/S架构的CDM项目管理系统在电力系统某企业得到应用, 并取得了良好的效果。

     

    Abstract: There is great potential of greenhouse gas emission reduction in our country, the number of the CDM projects is increasing day by day. This paper analyzes the characteristic of the development of CDM projects, and mainly presents the way and method of establishing the CDM project management system. Based on the development procedure of CDM project, the CDM project development model was constructed, in which such functions as project management, contract management, funds management, analysis and statistic of electricity output, knowledge database are realized. Moreover, the system has the abilities of warning and reminding, statistic and analysis and knowledge analysis, which optimizes the management of a great number of CDM projects during the development process, strengthens the risk management and provides the scientific decision\|making support. According to the above purpose, the management system based on the B/S architecture has been developed and put into operation, and shows its good performance.

     

/

返回文章
返回