Citation: | LIU Yicong, LIU Wenxia, LIU Zongqi, et al. Evaluation Method on Capacity Credit of Generalized Power Source in High Voltage Distribution Network[J]. Modern Electric Power, 2018, 35(5): 79-87. |
刘文霞,牛淑娅,石道桂,等.考虑运行策略及投资主体利益的主动配电系统储能优化配置[J].电网技术,2015,39(10):26972704.
LIU Wenxia, NIU Shuya, SHI Daogui, et al. Optimal allocation of ADS battery energy storage considering operation strategy and investment subject benefit [J]. Power System Technology, 2015, 39(10): 26972704. |
RODRIGUEZ-GARCIA L, PEREZ-LONDONO S, MORA-FLOREZ J. A methodology for composite load modeling in power systems considering distributed generation[C]//Transmission and Distribution: Latin America Conference and Exposition, 2012: 17.
|
曹琳洁.联合分布式电源的变电站选址定容研究[D].北京:华北电力大学,2014.
|
葛少云,王世举,路志英,等.基于分布式电源置信容量评估的变电站规划方法[J].电力系统自动化,2015,39(19):6167.
GE Shaoyun, WANG Shiju, LU Zhiying, et al. Substation optimization planning method based on capacity credit evaluation of distributed generator [J]. Automation of Electric Power System, 2015, 39(19): 6167. |
MADAENI S H,SIOSHANSI R,DENHOLM P. Estimating the capacity value of concentrating solar power plants:a case study of the southwestern united states[J]. IEEE Trans. on Power Systems, 2012, 27(2): 11161124.
|
王海超,鲁宗相,周双喜.风电场发电容量可信度研究[J].中国电机工程学报,2005,25(10):103106.
WANG Haichao, LU Zongxiang, ZHOU Shuangxi. Research on the capacity credit of wind energy resources [J]. Proceedings of the CSEE, 2005, 25(10): 103106. |
张宁,康重庆,陈治坪,等.基于序列运算的风电可信容量计算方法[J].中国电机工程学报,2011,31(25):19.
ZHANG Ning, KANG Chongqing, CHEN Zhiping, et al. Wind power credible capacity evaluation model based on sequence operation [J]. Proceedings of the CSEE, 2011, 31(25): 19. |
何俊,邓长虹,徐秋实,等.风光储联合发电系统的可信容量及互补效益评估[J].电网技术,2013,37(11):30303036.
HE Jun, DENG Changhong, XU Qiushi, et al. Assessment on capacity credit and complementary benefit of power generation system integrated with wind farm, energy storage system and photovoltaic system [J]. Power System Technology, 2013, 37(11): 30303036. |
GE Shaoyun,WANG Shiju,LU Zhiying,et al.Substation planning method in an active distribution network under low-carbon economy [J]. J Mod. Power Syst. & Clean Energy, 2015, 3(4): 468474.
|
葛少云,王浩鸣,徐栎.基于蒙特卡洛模拟的分布式风光蓄发电系统可靠性评估[J].电网技术,2012,36(4):3944.
GE Shaoyun, WANG Haoming, XU Li. Reliability evaluation of distributed generating system including wind energy, solar energy and battery storage using Monte Carlo Simulation [J]. Power System Technology, 2012, 36(4): 3944. |
蒲天骄,刘克文,陈乃仕,等.基于主动配电网的城市能源互联网体系架构及其关键技术[J].中国电机工程学报,2015,35(14):35113521.
PU Tianjiao, LIU Kewen, CHEN Naishi, et al. Design of ADN based urban energy internet architecture and its technological issues [J]. Proceedings of the CSEE, 2015, 35(14): 35113521. |
梁惠施,程林,刘思革.基于蒙特卡罗模拟的含微网配电网可靠性评估[J].电网技术,2011,35(10):7681.
LIANG Huishi, CHENG Lin, LIU Sige. Monte Carlo Simulation Based Reliability Evaluation of Distribution System Containing Microgrids [J]. Power System Technology, 2011, 35(10): 7681. |
葛少云,王浩鸣,王源山,等.含分布式风光蓄的配电系统可靠性评估[J].电力系统自动化,2012,36(5):1623.
GE Shaoyun, WANG Haoming, WANG Yuanshan, et al. Reliability evaluation of distribution system including distributed wind turbines, photovoltaic arrays and batteries [J]. Automation of Electric Power System, 2012, 36(5):1623. |
LIU W, NIU S, XU H. Optimal planning of battery energy storage considering reliability benefit and operation strategy in active distribution system[J]. Journal of Mod. Power Syst. & Clean Energy. 2017, 5(2): 177186.
|
汤庆峰,刘念,张建华.计及广义需求侧资源的用户侧自动响应机理与关键问题[J].电力系统保护与控制,2014,42(24):138147.
TANG Qingfeng, LIU Nian, ZHANG Jianhua. Theory and key problems for automated demand response of user side considering generalized demand side resources [J]. Power System Protection and Control, 2014, 42(24): 138147. |
葛少云,郭寅昌,刘洪,等.基于供电能力计算的高压配电网接线模式分析[J].电网技术,2014,38(2):405411.
GE Shaoyun, GUO Yinchang, LIU Hong, et al. Load supply capability based analysis of HV distribution network connection mode [J]. Power System Technology, 2014, 38(2): 405411. |
葛少云,王浩鸣.基于系统状态转移抽样的含分布式电源配电网可靠性评估[J].电力系统自动化,2013,37(2):2835.
GE Shaoyun, WANG Haoming. Reliability evaluation of distribution networks including distributed generations based on system state transition sampling [J]. Automation of Electric Power System, 2013, 37(2): 2835. |
WANG P, BILLINTON R. Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as alternative supply[J]. IEE Proceedings-Generation, Transmission and Distribution, 2001, 148(4): 355360.
|
BILLINTON R, CHEN H. Assessment of risk-based capacity benefit factors associated with wind energy conversion systems [J]. IEEE Transactions on Power Systems Pwrs, 1998, 13(3): 11911196.
|
张硕,李庚银,周明.考虑输电线路故障的风电场容量可信度计算[J].中国电机工程学报,2010,30(16):1925.
ZHANG Shuo, LI Gengyin, ZHOU Ming. Calculation of wind-farm capacity credit considering transmission line faults [J]. Proceedings of the CSEE, 2010, 30(16): 1925. |
1. |
蒋方帅,曹俊波,周志华,左鹿原,蒋家富,刘方. 计及风险的分布式电源与储能虚拟电厂鲁棒优化调度. 现代电力. 2023(04): 570-576 .
![]() | |
2. |
申洪涛,陶鹏,高玲玲,张洋瑞,张良. 多能互补下虚拟电厂参与电力市场的思考. 电测与仪表. 2022(08): 66-72 .
![]() | |
3. |
赵昊天,王彬,潘昭光,孙宏斌,郭庆来. 支撑云-群-端协同调度的多能园区虚拟电厂:研发与应用. 电力系统自动化. 2021(05): 111-121 .
![]() | |
4. |
陈汝昌,朱余启,伞晨峻,蒋贤强,王凯. 考虑水电机组振动区的日内电力偏差分摊方法. 广东电力. 2021(04): 18-23 .
![]() | |
5. |
陈张宇,刘东,刘浩文,尤宏亮,吴晓飞. 基于精细化需求响应的虚拟电厂优化调度. 电网技术. 2021(07): 2542-2550 .
![]() | |
6. |
陈张宇,刘东. 居民用户精细化需求响应建模及其激励策略. 哈尔滨理工大学学报. 2021(03): 1-12 .
![]() | |
7. |
龚超,张轩,赵越,赵晨,肖云鹏,李明涛. 考虑虚拟电厂可调能力的综合需求响应市场出清策略. 南方电网技术. 2021(12): 56-65 .
![]() | |
8. |
杨翾,骆哲,叶刚进,沈欣炜,尹建兵,黄天恩. 能源互网下虚拟电厂调度及市场竞价综述. 浙江电力. 2021(12): 46-53 .
![]() |