Citation: | LIANG Gang, GAO Ming, SONG Xinfu, et al. Residue Supply Capability of Partial Feeders in Distribution Networks[J]. Modern Electric Power, 2019, 36(4): 72-78. |
葛少云,贾欧莎.配电变电站多阶段优化规划模型[J].电网技术,2012,36(10):113118.
GE Shaoyun,JIA Ousha.Multi-stage model for optimal distribution substation planning[J].Power System Technology,2012,36(10):113118. |
左跃华.城市地下电缆改造[J].农村电气化,2013,2(7):1415.
ZUO Yuehua.Reconstruction of urban underground cable[J].Power Grid,2013,2(7):1415. |
肖峻,崔艳妍,王建民.配电网规划的综合评价指标体系与方法[J].电力系统自动化,2008,32(15):3640.
XIAO Jun,CUI Yanyan,WANG Jianmin.A hierarchical performance assessment method on the distribution network planning[J].Automation of Electric Power Systems,2008,32(15):3640. |
鲁文,杜红卫,丁恰,等.智能配电网优化调度设计及关键技术[J].电力系统自动化,2017,41(3):16,88.
LU Wen,DU Hongwei,DING Qia,et al.Design and key technologies of optimal dispatch for smart distribution network[J].Automation of Electric Power Systems,2017,41(3):16,88. |
董旭柱,吴争荣,刘志文,等.智能配电网研究热点[J].南方电网技术,2016,10(5):19.
DONG Xuzhu,WU Zhengrong,LIU Zhiwen,et al.Research focuses on smart distribution systems[J].Southern Power System Technology,2016,10(5):19. |
赵志强,高跃,付高善,等.配电系统实际运行的剩余供电能力计算方法[J].现代电力,2018,35(4):5965.
ZHAO Zhiqiang,GAO Yue,FU Gaoshan,et al.Calculation method of residue supply capability in actual operation of distribution systems[J].Modern Electric Power,2018,35(4):5965. |
肖峻,谷文卓,郭晓丹,等.配电系统供电能力模型[J].电力系统自动化,2011,35(24):4752.
XIAO Jun,GU Wenzhuo,GUO Xiaodan,et al.A supply capability model for distribution systems[J].Automation of Electric Power Systems,2011,35(24):4752. |
甄国栋,高新智,于树刚,等.配电网剩余供电能力实用模型[J].电网技术,2018,42(10):34203432.
ZHEN Guodong,GAO Xinzhi,YU Shugang,et al.The practical residue supply capability model of distribution network[J].Power System Technology,2018,42(10):34203432. |
XIAO Jun,GU Wenzhuo,WANG Chengshan,et al.Distribution system security region:definition,model and security assessment [J].IET Generation Transmission & Distribution,2012,6(10):10291035.
|
蒋绍忠.线性规划与网络优化[M].杭州:浙江大学出版社,1992:126142.
|
束金龙.线性规划理论与模型应用[M].北京:科学出版社,2003:3276.
|
曾梅清,田大钢.线性规划问题的算法综述[J].科学技术与工程,2010,10(1):152158.
ZENG Meiqing,TIAN Dagang.The review to the algorithm of linear programming problems[J].Science Technology and Engineering,2010,10(1):152158. |
肖峻,郭晓丹,王成山,等.配电网最大供电能力模型解的性质[J].电力系统自动化,2013,37(16):5965.
XIAO Jun,GUO Xiaodan,WANG Chengshan,et al.Properties of total supply capability model solution for distribution networks[J].Automation of Electric Power Systems,2013,37(16):5979. |
1. |
郭勇,李秋燕,马杰,全少理,李争博,刘友波. 新基建负荷与光伏接入下配电网可开放容量评估及优化. 电力工程技术. 2023(06): 64-73 .
![]() | |
2. |
李振生,孙佳龙,杜剑行,王丹,王继飞. 高压配电网剩余供电能力计算及应用. 电气技术. 2021(07): 78-82+88 .
![]() |