[1] 言茂松,张少华,程道平等.抽水蓄能电站的系统建模及其应用[J].中国电机工程学报,1996,16(1): 1016.
[2] 王民有,谢洪平,倪勇慎.抽水蓄能电站的最优运行方式及其静动态效益分析[J].电力系统及其自动化学报,1999,11(56): 3944.
[3] 丘文千.抽水蓄能电站运行优化的动态规划模型[J].水电自动化与大坝监测,2005,29(6): 610.
[4] 常黎,周建中,李琼等.抽水蓄能电站优化运行方式的混合遗传算法 [J].华中科技大学学报,2002,30(6):99101.
[5] 陈雪青,郑彤昕,石光等.有抽水蓄能电站的联合电力系统优化调度模型和算法[J].中国电机工程学报,1995,15(4): 274280.
[6] 李强,袁越,李振杰等.考虑峰谷电价的风电-抽水蓄能联合系统能量转化效益研究[J].电网技术,2009,33(6): 1318.
[7] 胡泽春,丁华杰,孔涛.风电-抽水蓄能联合日运行优化调度模型[J].电力系统自动化,2012,36(2): 3641.
[8] Edgrado D.Castronuovo,Joao A.Pecas Lopes.Optimal operation and hydro storage sizing of a wind-hydro power plant[J].Electrical Power and Energy Systems,2004,26: 771778.
[9] Juan I.Perez-Diaz,Alejandro Perea and Jose R.Wilhelmi.Optimal short-term operation and sizing of pumped-storage power plants in systems with high penetration of wind energy[C].Energy Market (EEM),2010 7th International Conference on the European,2010: 16.