[1]
|
周艳菊,邱莞华,王宗润.供应链风险管理研究进展的综述与分析[J].系统工程, 2006,24(3): 17. |
[2]
|
Lee H L, Padmanabhan V, Whang S. Information distortion in a supply chain: The bullwhip effect [J]. Management Science, 1997, 43(4): 546558. |
[3]
|
Cranfield Management Schoo1. Supply chain reliability[R]. Cranfield University, 2002. |
[4]
|
冯光.离散型零部件企业基于价值链的全面风险控制[J].浙江工业大学学报,2011,10(2):188193. |
[5]
|
陈景辉.集团公司全面风险评价及其影响效应研究[D].大连:大连理工大学,2011. |
[6]
|
Juttner U, Peck H, Christopher M. Supply Chain Risk Management: Outlining an Agenda for Future Research [J]. International Journal of Logistics: Research and Applications, 2003, 6(4):215229. |
[7]
|
邓明然,夏喆.基于耦合的企业风险传导模型探讨[J]. 经济与管理研究,2006(3): 6668. |
[8]
|
Ahmed M. Khalid, Gulasekaran Rajaguru. Financial Market Contagion or spillovers Evidence from Asian Crisis using Multi-variate GARCH Approach [J]. Seminar Series of the University of New South Wales, 2006 Program. Bond University. 2006,5. |
[9]
|
张金清,李徐.资产组合的集成风险度量及其应用——基于最优拟合Copula函数的VaR方法[J].系统工程理论与实践,2008(9):1423. |
[10]
|
吴军,李建,汪寿阳.供应链风险管理中的几个重要问题[J].管理科学学报,2006,9(6):112. |
[11]
|
Marco Ghirardi, Giuseppe Menga, Nicola Sacco. An optimisation-oriented model of distributed supply-chain [J]. Mathematics and Computers in Simulation, 2008, 79(4): 937946. |
[12]
|
Christopher Tang, Brian Tomlin. The power of flexibility for mitigating supply chain risks [J]. Int. J. Production Economics, 2008, 116(1):1227. |
[13]
|
Li Jianping, Li Minglu, Wu Dengsheng, etc. An integrated risk measurement and optimization model for trustworthy software process management [J]. Information Sciences, 2012, 191(1): 4760. |
[14]
|
林勇,马士华.供应链企业合作机制与委托实现理论[J].南开管理评论,2000(2):4953. |
[15]
|
徐玖平,陈书建.不对称信息下风险投资的委托代理模型研究[J].系统工程理论与实践,2004,(1):1924. |
[16]
|
徐兵,朱道立.竞争供应链的结构和链内协调策略分析[J].运筹与管理,2008,17(5):5157. |
[17]
|
舒彤,陈收,汪寿阳,等.基于影响因子的供应链协同预测方法[J].系统工程理论与实践,2010,30(8):13631370. |
[18]
|
谭忠富,张明文,王绵斌.煤炭价格与发电价格联动平衡关系模型[J].电力系统及其自动化学报,2009,21(3):15. |
[19]
|
于立宏,郁义鸿.纵向结构特性与电煤价格形成机制[J].中国工业经济,2010(3):6575. |
[20]
|
杨彤,聂锐,刘玥.基于价格传导复杂网络模型的煤电价格传导效应模拟分析[J].中国矿业,2009,18(9):3135. |
[21]
|
Mehdi Sadeghi, Saeed Shavvalpour. Energy risk management and value at risk modeling [J]. Energy Policy, 2006, 34(18): 33673373. |
[22]
|
柴建,郭菊娥,龚利,等.基于Bayesian-SV-SGT模型的原油价格“Value at Risk”估计[J].系统工程理论与实践,2011,31(1):817. |
[23]
|
Chanwit Boonchuay, Weerakorn Ongsakul. Optimal risky bidding strategy for a generating company by self-organising hierarchical particle swarm optimization [J]. Energy Conversion and Management, 2011, 52(2): 10471053. |
[24]
|
Azevedo F, Valea Z A,Moura Oliveira P B, Khodr H M. A long-term risk management tool for electricity markets using swarm intelligence [J]. Electric Power Systems Research, 2010, 80(4): 380389. |
[25]
|
Jalal Kazempour S, Mohsen Parsa Moghaddam. Risk-constrained self-scheduling of a fuel and emission constrained power producer using rolling window procedure [J]. Electrical Power and Energy Systems, 2011, 33(2): 359368. |
[26]
|
Yu Zuwei. A spatial mean-variance MIP model for energy market risk analysis [J]. Energy Economics, 2003, 25: 255268. |
[27]
|
雷莲萍,李华.铁路主要通路煤炭运输的预测与展望[J].煤炭经济研究, 2001(4):6871. |
[28]
|
郑勇.煤炭铁路运输将对供需调整产生影响[J].中国煤炭,2003,29(6):1416. |
[29]
|
张星星,孙璐.我国煤炭产业市场结构的问题研究[J].太原科技,2009(8):4748. |
[30]
|
曲创,秦阳洋.中国煤电谈判势力的来源与比较[J].财经问题研究,2009(10):4651. |
[31]
|
王庆云,王溢辉.我国煤炭运输系统发展展望[J].中国物流与采购,2006(11):1619. |
[32]
|
雷莲萍,李华,石群.电力结构变化对铁路煤炭运输的影响[J].煤炭经济研究,1999(12):2123. |
[33]
|
张鲲,刘宏志,刘道新,等.基于博弈论的发电与输电协调规划[J].华东电力,2011,39(2):168171. |
[34]
|
黄良宝,朱忠烈,王峥,等.节能发电调度对华东电网规划的影响研究[J].华东电力,2009,37(5):686690. |
[35]
|
陈远,任惠,蒋群.含风电场的发输电系统并网方案的选择[J].广东电力, 2011,24(1):5861. |
[36]
|
黄守军,任玉珑,孙睿,等.基于碳减排调度的激励性厂网合作竞价机制设计[J].中国管理科学,2011,19(5):138146. |
[37]
|
张明文,谭忠富,于超.燃煤发电机组之间节能置换及效益分配优化模型[J].华北电力大学学报,2009,36(3):108111. |
[38]
|
王绵斌,谭忠富,张蓉,等.基于“增量法”下的电网投资风险评估模型[J].电工技术学报,2009,21(9):1824. |
[39]
|
魏一鸣等.中国可持续发展战略报告[M].北京:科学出版社,2006. |
[40]
|
Yang Ming. Chinas energy efficiency target 2010[J].Energy Policy, 2008, 36(2):561570. |
[41]
|
Steenhof P A. Decomposition of electricity demand in China's industrial sector [J]. Energy Economics, 2006, 28(3):370384. |
[42]
|
谭忠富,于超,姜海洋,等.用户端峰谷分时电价对发电端节煤影响分析模型[J].系统工程理论与实践,2009,29(10):94101. |
[43]
|
Masaaki Bannai, Yasushi Tomita. Risk hedging against the fuel price fluctuation in energy service business [J]. Energy, 2007, 32(11): 20512060. |
[44]
|
Joskow P L. Vertical Itegration and Long-term Contracts: The Case of Coal-Burning Electric Generating Plants [J]. Journal of Law, Economics and Organization, 1985(1): 3380. |
[45]
|
Joskow P L. Contract Duration and Relationship-Specific Investments-Empirical Evidence from Coal Markets [J]. Journal of Economics, 1987 (21): 251274. |
[46]
|
Joskow P L. Price Adjustment in Long-term Contracts: The Case of Coal [J]. Journal of Law and Economics, 1988(31): 4783. |
[47]
|
Joskow P L. The Performance of Long-Term Contracts-Further Evidence from Coal Markets [J]. American Economic Review, 1990(77): 168185. |
[48]
|
王华清,宋学锋.煤运电产业链纵向关系研究现状述评与展望[J].中国矿业,2009,18(9):116120. |
[49]
|
Liu Hongling, Jiang Chuanwen, Zhang Yan. A review on risk-constrained hydropower scheduling in deregulated power market [J]. Renewable and Sustainable Energy Reviews, 2008(12): 14651475. |
[50]
|
Pousinho H M I, Mendesc V M F,Catalo J P S. A risk-averse optimization model for trading wind energy in a market environment under uncertainty [J]. Energy, 2011, 36(8): 49354942. |
[51]
|
Serhan Oksay, Emre lseri. A new energy paradigm for Turkey: A political risk-inclusive cost analysis for sustainable energy[J]. Energy Policy, 2011, 39(5): 23862395. |
[52]
|
Iivo Vehvilainen, Jussi Keppo. Managing electricity market price risk [J]. European Journal of Operational Research, 2003, 145: 136147. |
[53]
|
Huanga Yun-Hsun, Wu Jung-Hua. A portfolio risk analysis on electricity supply planning [J]. Energy Policy, 2008, 36(2): 627641. |
[54]
|
Ramanathan R. Comparative Risk Assessment of energy supply technologies: a Data Envelopment Analysis approach [J]. Energy, 2001(26): 197203. |
[55]
|
Ryan Wiser, Devra Bachrach, Mark Bolinger. Comparing the risk profiles of renewable and natural gas-fired electricity contracts [J]. Renewable and Sustainable Energy Reviews, 2004, 8(4):335363. |
[56]
|
Perry Sadorsky. Modeling renewable energy company risk [J]. Energy Policy, 2012, 40: 3948. |
[57]
|
于智为,胡小军,张希良,等.能源系统复杂性管理建模方法研究[J].管理学报,2008,5(5):670673. |
[58]
|
包森,田立新,王军帅.中国能源生产与消费趋势预测和碳排放研究[J].自然资源学报,2010,25(8):12481254. |
[59]
|
夏德建,任玉珑,史乐峰.中国煤电能源链的生命周期碳排放系数计量[J].统计研究,2010,27(8):8289. |
[60]
|
林伯强,姚昕,刘希颖.节能和碳排放约束下的中国能源结构战略调整[J].中国社会科学,2010,(1):5871. |
[61]
|
Hossam A. Gabbar. Engineering design of green hybrid energy production and supply chains [J]. Environmental Modeling & Software, 2009, 24(3): 423435. |
[62]
|
Ahu Gumrah Dumanli, Ibrahim Gulyurtlu, Yuda Yueruem. Fuel supply chain analysis of Turkey [J]. Renewable and Sustainable Energy Reviews, 2007, 11(9): 20582082. |
[63]
|
Juozas Augutis, Ricardas Krikstolaitis, Linas Martisauskas, Sigita Peciulyte. Energy security level assessment technology [J]. Applied Energy, 2012, 97:143149. |
[64]
|
He Yong-xiu,Zhou Ying. Early warning model for risks of energy prices and energy price ratios in Chinas energy engineering [J]. Systems Engineering Procedia, 2012(3): 2229. |
[65]
|
Skouloudis A, Flamos A, Psarras J. Energy Supply Risk Premium: Review and Methodological Framework [J]. Energy Sources, Part B, 2012, 7(1):7180. |
[66]
|
Didem Cinar, Gulgun Kayakutlu. Scenario analysis using Bayesian networks: A case study in energy sector [J]. Knowledge-Based Systems, 2010, 23(3): 267276. |