徐宁, 周波, 凌云鹏, 徐楠, 郭占伍, 张雨源, 许小峰, 李伟, 卢灿. 现货市场下独立储能参与能量与辅助服务协同优化策略[J]. 现代电力. DOI: 10.19725/j.cnki.1007-2322.2023.0193
引用本文: 徐宁, 周波, 凌云鹏, 徐楠, 郭占伍, 张雨源, 许小峰, 李伟, 卢灿. 现货市场下独立储能参与能量与辅助服务协同优化策略[J]. 现代电力. DOI: 10.19725/j.cnki.1007-2322.2023.0193
XU Ning, ZHOU Bo, LING Yunpeng, XU Nan, GUO Zhanwu, ZHANG Yuyuan, XU Xiaofeng, LI Wei, LU Can. Collaborative Optimization Strategy of Energy and Auxiliary Services with Independent Energy Storage Participating Under the Spot Market[J]. Modern Electric Power. DOI: 10.19725/j.cnki.1007-2322.2023.0193
Citation: XU Ning, ZHOU Bo, LING Yunpeng, XU Nan, GUO Zhanwu, ZHANG Yuyuan, XU Xiaofeng, LI Wei, LU Can. Collaborative Optimization Strategy of Energy and Auxiliary Services with Independent Energy Storage Participating Under the Spot Market[J]. Modern Electric Power. DOI: 10.19725/j.cnki.1007-2322.2023.0193

现货市场下独立储能参与能量与辅助服务协同优化策略

Collaborative Optimization Strategy of Energy and Auxiliary Services with Independent Energy Storage Participating Under the Spot Market

  • 摘要: 针对目前独立储能电站在运营上缺乏经济性及高效性,提出一种储能参与电能量市场与辅助服务市场协同工作的策略,首先,通过现货市场电价确定储能参与能量市场的时段,并在其余时段进行电能量和辅助服务市场协同工作;其次,采用动态规划方法以储能电站收益最大化为目标,构建多时间尺度的储能参与现货电能量和调频市场协同优化模型;最后,通过仿真分析,对比独立储能只参与单独市场与联合优化情况下的收益及储能电站的出力情况,验证所提方案的可行性及有效性。

     

    Abstract: In allusion to the lack of efficiency and cost-effectiveness operation of independent energy storage power stations at present, a strategy for collaborative work between the electricity energy market and the auxiliary service market with energy storage participating was proposed. Firstly, the period of energy storage participation in the electricity energy market was determined by the spot market electricity price, and the electricity energy market and auxiliary service market were coordinated in the remaining periods. Secondly, taking maximizing the benefits of energy storage power stations as an object, the dynamic programming method was used to construct a multi-time scale collaborative optimization mode for energy storage participation in spot electricity power and frequency regulation markets. Finally, through simulation analysis, the revenue and output of energy storage power plants under the conditions of independent energy storage only participating in a separate market and joint optimization were compared to verify the feasibility and effectiveness of the proposed strategy

     

/

返回文章
返回